Lock-in calendar · Jash Engineering Limited IPO

Jash Engineering Limited — Lock-in Expiry Dates

Listed 30 Oct 2019 · JASH · updated 19 Sept 2026, 1:33 am IST

today Anchor investors 27 Nov Anchor investors 26 Jan Pre-IPO shareholders 25 Apr Promoter holding abo… 25 Apr Promoter minimum con… 27 Apr

All lock-in periods for this issue have expired.

These dates are approximate. We do not hold a confirmed allotment date for this issue, so they are counted from two working days before listing — the usual gap, but not a certainty. The offer document is the authority.
HolderUnlocksAwayWhat it is
Anchor investors (first half) 27 Nov 2019 unlocked Half of every anchor allocation unlocks 30 days after allotment. This is usually the first tranche of any size to become sellable.
Anchor investors (second half) 26 Jan 2020 unlocked The remaining anchor holding. The 30/90 split was introduced in 2021 — before that the whole anchor book unlocked at once.
Pre-IPO shareholders (non-promoter) 25 Apr 2020 unlocked Existing non-promoter shareholders — early investors, ESOP holders, institutions who bought before the issue. Often the largest single pool.
Promoter holding above minimum contribution 25 Apr 2020 unlocked Whatever promoters hold beyond the 20% minimum contribution.
Promoter minimum contribution (20%) 27 Apr 2021 unlocked The 20% of post-issue capital promoters must retain. Reduced from three years to eighteen months in 2022.
A date, not a prediction. An expiry means these shares become sellable. Whether anyone sells is a separate question, and one we do not answer.

Derived from SEBI ICDR lock-in periods and this issue's estimated allotment date. See how the periods work.